







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Colleyville
If you’re planning an addition or an ADU in Colleyville, you already know this isn’t a starter-home market. Most of the work here happens on large custom homes from the late 1980s through the 2000s, on generous lots off Glade Road, Pleasant Run, and Highway 26, and those projects come with real complexity: HOA design review, strict city permitting, and on some lots, utilities that never quite caught up with the house. We know Colleyville because we work here, and we plan the whole job around how this city builds.
Call (833) 991-4970 and a live person picks up, day or night. Scope in writing, allowances in writing, change orders in writing – that’s how a Colleyville addition gets priced right the first time.
Whether you’re in the 76034 ZIP near Colleyville Heritage or closer to the Grapevine border, the first conversation is free and the estimate is in writing.
Why Barrett & Sons Construction Is Colleyville’s Preferred Home Additions & ADU Company

Colleyville homeowners tend to be careful buyers. Many have already been through a national outfit that quoted one number on the phone and handed over a different bill at the door, and they don’t want that again. What they want is a name they can look up. We publish Tom Barrett’s name, address, and license number, and the L.O.C.A.L. values code runs through every page we sign: Local roots, On time, Community first, Accountable, Loyal.
Our technicians bring up to 28 years of experience to the trades an addition demands, and we’ve been proud to serve local communities for over 29 years – owner-operated since day one, not a franchise sending strangers in a matching van. The 90-Day Done Right Promise is written on every contract, not buried in fine print: if something isn’t done right, one call brings us back to make it right.
For Colleyville specifically, response time is straightforward. We serve this city directly, so there’s no trip charge inside the county and no weeks-long wait to get a walkthrough scheduled. When you ask about a room addition off your kitchen or a detached ADU behind the garage, you get a real plan with a real calendar – and if you have another contractor’s written estimate in hand, we’ll give you a free second opinion on it before you sign anything.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Colleyville
Our Home Additions & ADU team builds across a wide range of scopes, but the Colleyville work clusters around a few familiar jobs. Here’s how each one plays out on the ground here.
ADU Design & Permitting in Colleyville
ADU design in Colleyville starts with the lot, not the floor plan. Before a line gets drawn, we look at setbacks, septic field placement, and whether the HOA has design standards the street enforces. Permits get pulled and inspections signed – because the last contractor most folks used told them permits were optional, and that’s a shortcut nobody can afford on a structure this size.

Second Story Additions in Colleyville
A second story is often the cleanest way to add square footage without eating the yard on a one-acre-plus Colleyville lot. The wrinkle here is the soil. Expansive clay that moves with every wet spring and dry August puts real demands on a foundation carrying a new second floor, so structural planning and engineering come first. Get that right and the addition sits true for the long run.

Room Additions in Colleyville
Most Colleyville room additions we scope are primary suites, expanded kitchens, and pool houses that tie into the existing custom home rather than fight it. That means matching trim profiles, rooflines, and exterior materials to what’s already there – sometimes matching detail from a house built 25 years ago. We order premium brands you can look up by name, not mystery parts off a truck.

Garage Conversion ADU in Colleyville
A garage conversion is the fastest route to an ADU without a full new build, and Colleyville garages are usually big enough to make it work. The job lives or dies on the invisible parts: insulation against 100°F+ summers, foundation interface with shifting clay, plumbing and electrical that pass inspection clean. Do those in order and a garage becomes genuine living space, not a converted shed with a bed in it.
Trusted Brands We Service in Colleyville
Nothing creates a change order faster than an allowance that was never written down, and premium materials are where that bites hardest. Cabinetry specs and countertop selections carry real price swing, so those numbers belong on paper before anyone orders. We work alongside the brands you’ll actually find in a high-end Colleyville home, and the materials on exterior projects run to companies like Belgard and Unilock on hardscape, or Bufftech and ActiveYards on fencing. You can look each of those up yourself – no mystery off-brand label on the van. Turnaround on material decisions stays tight because the schedule depends on it.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Colleyville Homes
The problems we see in Colleyville tend to be planning problems, not building problems. Here’s what catches homeowners off guard:
- Custom cabinetry ordered before permits clear. On a typical Colleyville addition, the first surprise isn’t the framing. Order custom cabinetry before the HOA design review and city permits are approved, and you’ve locked in dimensions that later collide with inspection sign-off. The order shouldn’t be released until both are in hand.
- The old septic field. Many Colleyville lots were developed with septic systems and private wells before city utilities reached them. So an addition or detached ADU can trigger a septic field evaluation or well upgrade – one step that can add weeks and five figures before framing even starts.
- Allowances treated as fixed prices. When an allowance isn’t written as a range, a mid-build countertop selection turns into an unexpected change order. An allowance that isn’t on paper is a surprise waiting for a date.
- Clay soil meeting a new second floor. Expansive clay shifts with moisture through the seasons, and heavy demands on foundations are common. Add a second story without proper structural planning and you invite problems down the road.
Pricing for Home Additions & ADU in Colleyville, TX

A typical home addition in Colleyville runs $45,000 to $130,000, and a full ADU build runs $90,000 to $220,000. A garage conversion sits lower, at $30,000 to $80,000, because you’re working within an existing shell. Those ranges move based on square footage, foundation work, septic or well upgrades, custom cabinetry, and how much HOA design review shapes the plans. We quote from a written, line-item scope so you see where every dollar goes, and any price change arrives as a written change order before work moves.
| Project | Colleyville Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Call (833) 991-4970 for a free estimate on your Colleyville project. The 10% Senior & Veteran discount is permanent, and there’s no trip charge inside the county.
We Also Serve Cities Near Colleyville
Our crews and partner pros regularly work the towns around Colleyville, including Bedford, Hurst, Southlake, and Euless. The same written scope, permits pulled, and 90-Day Done Right Promise apply wherever the job sits. If you’re just over the line from Colleyville, we can still schedule a walkthrough. Take a look at our coverage for Colleyville and the surrounding area.
Serving Colleyville, TX – Our Local Coverage Area
We serve Colleyville and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Colleyville

Often, yes. Many Colleyville lots in the 76034 area were developed with septic systems and private wells before city utilities reached them, so a room addition or detached ADU may need a septic field evaluation – and possibly a field relocation or a tie-in to city sewer. That evaluation can add weeks and five figures, which is why we check it before design, not after. Call (833) 991-4970 to schedule a free estimate and we’ll walk the lot with you.
On this tier, lead times set the calendar more than labor does. Custom cabinetry and specialty finishes can carry long lead times, so we place those orders only after permits and HOA design review are approved – otherwise a locked-in dimension collides with inspection later. The schedule gets built around the longest lead item, not the shortest. Call (833) 991-4970 for an estimate that maps those lead times into your timeline.
Every scope, every allowance, and the full price should be in writing before a single nail moves. Allowances need to be written as ranges, not fixed prices, so a mid-build countertop pick doesn’t turn into a surprise change order. Any change to scope gets a written change order issued before work proceeds. Call (833) 991-4970 to review a written, line-item estimate – the second opinion on another contractor’s estimate is free.
Expansive clay shifts with moisture, wet springs and dry summers, and a new second floor adds real load on that foundation. Structural planning and engineering have to come before framing so the addition sits true as the soil moves. Skipping that step invites foundation problems down the line. Call (833) 991-4970 for a free estimate that accounts for the soil under your lot.
Yes, and it’s the fastest route to an ADU on most Colleyville lots. The job hinges on the parts you don’t see: insulation against summer heat, foundation interface with clay, and plumbing and electrical that pass inspection clean. Done in the right order, a garage becomes genuine living space; rushed, it’s a converted shed with a bed in it. Call (833) 991-4970 – estimates are free.
Ready to talk about your Colleyville addition or ADU? Call (833) 991-4970 for a free estimate, and a live person will answer, day or night. We’ll walk the lot, check the septic and permitting questions first, and put the whole scope in writing before anyone picks up a hammer. Every eligible job gets its permits pulled and inspections signed, and every finished project is backed by the written 90-Day Done Right Promise.
Written by the team at Barrett & Sons Construction.












