







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Abodu Home Additions & ADU in Irving: What to Know First
We build and finish Abodu home additions and ADUs in Irving as an independent Abodu service provider. A design-and-permit package usually takes 6 to 10 weeks to pass through Irving’s Development Services review, while the build itself runs 3 to 6 months depending on the model and site. Home additions and ADU work in Irving typically runs $45,000 to $130,000, with detached ADUs priced separately at $90,000 to $220,000. Final price depends on site conditions, utility runs, and finish level, so we quote from a plan review, not a phone guess.
This page is for Abodu owners and buyers in Irving who need a garage conversion, a detached unit, a junior ADU, or a room addition finished to code. Call (833) 991-4970 and a live person answers, day or night.
How Abodu Products Fail – and How We Fix Them
Abodu’s prefab and panelized systems are engineered well. Where we get called in Irving is at the seams: the connection between a factory-built unit and a site-built foundation, and the utility tie-ins a general installer rushed. Here are the patterns we see most.
- Foundation and leveling drift on detached units. Irving’s expansive clay soil swells and shrinks with our wet-spring, dry-summer cycle, and a slab that wasn’t engineered for it will move. We see doors that stick in August and close fine in January, and hairline cracks along the panel joints. Our fix is a pier-and-beam or engineered slab correction with proper drainage slope away from the unit, then re-shimming the panel connections before we touch the finishes.
- Utility tie-in leaks at the wet wall. Many Abodu garage-conversion and junior ADU installs tie the new bathroom and kitchenette into the main house’s existing supply and drain lines. On a 1950s or 1960s ranch in the Las Colinas or Valley Ranch area, that original line is often galvanized or undersized for the added load. We pressure-test the tie-in, upgrade the run to PEX or copper where it’s failing, and pull the plumbing permit so the inspection is on record.
- Roof-to-wall flashing on attached additions. Where an Abodu addition meets the original roof plane, a flashed-and-counter-flashed transition is the difference between dry and a ceiling stain after the first north Texas hailstorm. We re-flash with GAF or CertainTeed materials matched to the existing roof pitch, because the factory panel seal alone won’t survive a two-inch hail event.
- HVAC sizing on sealed prefab envelopes. A tight, well-insulated Abodu unit can be over-cooled or short-cycled by a system sized for the old garage volume. We run a load calculation, right-size the mini-split or ducted unit, and make sure condensate drains run to daylight, not into the slab.
- Electrical panel capacity for the new load. A detached ADU with its own kitchen, water heater, and dryer often pushes a 100-amp main service past its limit. We check the panel, coordinate the service upgrade with Oncor, and get the electrical permit and inspection signed before the walls close.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Abodu Home Additions & ADU Process
- 1
Site visit and plan review. We walk the property, read the Abodu drawings, check setbacks against Irving’s zoning, and note soil, drainage, and utility conditions before we quote.
- 2
Written scope and allowance sheet. Every line is priced, every allowance is on paper, and every brand is named. The allowance that isn’t on paper is a surprise waiting for a date.
- 3
Permits pulled. We file with the City of Irving, handle the plan review comments, and schedule inspections. The permit inspector works for you, not for us.
- 4
Site prep and foundation. Grading, drainage, slab or pier work, and utility rough-in done to the engineered plan.
- 5
Set and finish. Unit placement, panel connections, roof flashing, MEP trim-out, and interior finishes. OEM Abodu components where they belong; quality aftermarket only where it performs as well or better, and only with your sign-off.
- 6
Final inspection and walkthrough. We pass the inspection, walk the job with you, and hand over the written 90-Day Done Right Promise. If something’s off, one call brings us back.
See the difference
Before
After
Before
After
Before
AfterWhat Abodu Home Additions & ADU Costs in Irving

These are the ranges we quote in Irving, based on real local labor and material costs. Your final number depends on site conditions and finish level.
| Scope | Typical Range |
|---|---|
| Home Addition (attached, room addition) | $45,000 – $130,000 |
| Garage Conversion ADU | $30,000 – $80,000 |
| Junior ADU / Interior Conversion | $45,000 – $95,000 |
| New Detached ADU | $90,000 – $220,000 |
| ADU Site Prep & Utilities (per run) | $6,000 – $25,000 |
| ADU Design & Permitting | $3,500 – $12,000 |
What moves the price: soil correction, distance of utility runs, whether the electrical panel needs a service upgrade, and finish level. Every change order is in writing before work moves. Call (833) 991-4970 for a free estimate on your Abodu project in Irving.
Why Irving Homeowners Call Barrett & Sons Construction Irving for Abodu Work
We’re owner-operated and local, and that shows up in how we work. Tom Barrett and his sons are on-site most days, so you’re not getting a stranger from a call center. Every eligible job gets permits pulled and inspections signed, and every price change comes as a written change order first. Our crew members are background-checked and carry the Barrett & Sons name.
We also work across the trades a full Abodu build touches: KraftMaid and Cambria in the kitchenettes, Kohler fixtures, GAF roofing, and PGT windows on the additions. Ask anyone on your street, or look up the license number yourself. We’re proud to have served local communities for over 29 years.
FAQs

Yes. We service and finish Abodu units for any owner in Irving, regardless of who installed the original system. Call (833) 991-4970 and we’ll schedule a site visit.
Not if the work is done correctly. We follow Abodu’s installation specs on structural connections and use OEM components where the warranty requires them, so your factory coverage stays intact. We’ll flag any place where an aftermarket part could affect the warranty before we order it.
Permitting usually runs 6 to 10 weeks through the City of Irving, and the build adds 3 to 6 months for a detached unit, less for a garage conversion or junior ADU. The site visit gives us the real picture.
Yes. Every eligible job in Irving gets permits pulled and inspections signed. An unpermitted addition can fail a future appraisal or sale, and we won’t put our name on that.
Most garage conversion ADUs in Irving run $30,000 to $80,000, depending on whether the slab and utilities need upgrades. Call us for an exact quote. Estimates are free.
Only if the scope changes, and then only through a written change order you approve before any work moves. No surprise invoices at the end.
Ready to price your Abodu addition or ADU in Irving? Call (833) 991-4970 for a free estimate. A live person answers, and we’ll walk your project before we quote a number.
Written by the team at Barrett & Sons Construction Irving, serving Irving and nearby areas.












