







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Bathroom Remodel Really Costs in Irving, TX
A full bathroom remodel in Irving typically runs $9,000 to $28,000, and where you land in that range depends less on tile and more on what’s under the floor. The cheapest part of remodeling a bathroom in a 1960s south Irving pier-and-beam home is often the tile. The expensive part is the 40 feet of cast-iron drain line under the crawl space that hasn’t been looked at since Nixon was president. Call (833) 991-4970 and we’ll walk you through what your house is actually likely to need before you sign anything.

Why Irving Bathroom Quotes Drift: Pier-and-Beam Math
South Irving has a lot of 1950s through 1970s ranch homes built on pier-and-beam foundations. That’s good news and bad news for a bathroom budget.
The good news: we can get under the floor to look at the plumbing without cutting concrete. On a slab home, finding a failing drain means jackhammering the bathroom floor and paying to put it back. On pier-and-beam, we crawl the space, inspect the line, and know what we’re dealing with before demo day.
The bad news: what we find is usually cast-iron pipe that’s cracked, root-infiltrated, or collapsed outright. Replacing that line before finish work begins commonly adds $3,000 to $10,000 to a job. That’s why the “$10,000 bathroom remodel” figure you see online is fiction for large parts of south Irving. The number is real, but it doesn’t survive contact with a 60-year-old drain.
We put a drain line assessment on every bathroom scope as a named line item. If the pipe is sound, you see that in writing. If it isn’t, the replacement cost comes to you as a written change order before demo starts. No invoice surprise at the end.
Bathroom Remodel Cost Ranges in Irving
Here’s what our Irving projects typically come in at, by line item. These ranges assume standard finishes; premium tile and fixtures push toward the top end.
| Project | Typical Cost Range |
|---|---|
| Full bathroom remodel | $9,000 - $28,000 |
| Small bathroom remodel | $5,000 - $12,000 |
| Walk-in shower installation | $4,500 - $12,000 |
| Tub-to-shower conversion | $3,500 - $10,000 |
| Shower replacement | $3,000 - $8,500 |
| Bathroom vanity installation | $800 - $3,000 |
Two things move you around inside those numbers: the drain line situation and the foundation. Everything else is finish selection, and finish selection is the part you control.

Clay Soil, Cracked Grout, and the Substrate Line Nobody Quotes
Irving sits on expansive black clay. It swells in spring rain and shrinks in August drought, and that seasonal movement works on a slab-foundation bathroom every year. Grout lines crack. Shower pans unseat. Tile pops loose at the corners.
Most of that is preventable with the right substrate. We install an uncoupling membrane (Schluter Ditra is what we use) over slab before tile goes down. It decouples the tile from the slab’s movement so the floor can breathe without taking your grout with it. It’s a real line-item cost. Budget remodelers skip it because it’s invisible once the tile is set, and then you’re calling someone back in 18 months to tear out a floor that never should have failed.
We’d rather quote it up front than explain it later. That’s the whole reason every scope, every allowance, and every price change arrives in writing before work happens.
HOA Venting and Architectural Review in Valley Ranch and Las Colinas
The newer side of Irving plays by different rules. Valley Ranch and Las Colinas sit inside planned communities with architectural review boards. If your remodel changes an exterior vent, reconfigures a wet wall that touches the exterior envelope, or adds a new exhaust fan penetration, that change may need HOA approval before a permit is issued.
We catch this in pre-construction, not mid-tile. Permits get pulled and inspections get signed on every eligible job, and that includes knowing when the HOA has to sign off first. The permit inspector works for you, not for us. That’s why we like him.
The Irving market splits hard this way: older flood-prone neighborhoods along the Elm Fork and Bear Creek corridors where foundation and drainage work dominate, and the Las Colinas and Valley Ranch corridor with its strict design covenants. A bathroom in each needs a different plan.
Common Scenarios We See in Irving Bathrooms
- The 1962 south Irving ranch. Original cast-iron drain, tile set directly on a mud bed, and a vent fan that dumps into the attic. The budget conversation starts under the floor, not at the tile showroom.
- The 1985 Valley Ranch two-story. Solid plumbing, but the shower pan has been leaking into the ceiling below for two winters. HOA review needed if we touch the exterior vent.
- The Las Colinas condo conversion. Tight footprint, strict design covenants, and a tub-to-shower conversion that makes far more sense than trying to fit a new tub into a 5×8 room.
- The 1978 slab home near the Bear Creek corridor. Grout cracking every spring, tile lifting at the door threshold. Uncoupling membrane and a proper substrate fix it once.
Why Homeowners in Irving Call Us Back
Barrett & Sons Construction Irving is owner-operated. The owner’s sons run the crews. Our technicians have up to 28 years of experience, and the people who show up at your door are background-checked and carry our name. Every completed job is backed by the written 90-Day Done Right Promise: if grout cracks, caulk separates at the tub surround, or a drain runs slow within 90 days, one call brings us back. It’s on the contract, not buried in a warranty exclusion form.
We also publish the license number. Look it up before you sign anything. We’d rather you did. And a live person answers the phone 24 hours a day, seven days a week, not a voicemail box.
For a fuller rundown of what we do, see our Bathroom Remodeling page or start from the home page to see the other trades we handle.
Standing offers we run: $40 off any repair over $200, a free second opinion on any written estimate, no trip charge inside the county, and a permanent 10% Senior & Veteran discount. If you’ve got a bid from someone else that doesn’t add up, bring it to us.
FAQs
A full bathroom remodel in Irving runs $9,000 to $28,000, with small bathroom remodels at $5,000 to $12,000. Where you land depends mostly on whether the drain line needs replacing and whether the floor needs a proper substrate. Call (833) 991-4970 for an exact quote. Estimates are free.
Repairing a failing cast-iron line usually costs more over time than replacing the run, because the rest of the pipe is the same age. Replacing the line during a remodel typically adds $3,000 to $10,000, and doing it while the floor is already open saves you from tearing the bathroom apart a second time. Call (833) 991-4970 and we’ll scope it in writing before demo.
Often, yes. A live person answers our phone 24 hours a day, so you’re not waiting on a callback. We’ll assess your bathroom and get an estimate to you. Call (833) 991-4970.
Yes, most Irving bathroom remodels that move plumbing, electrical, or framing require a permit and inspection. We pull permits and sign off inspections on every eligible job, and we handle the HOA architectural review in Valley Ranch and Las Colinas when the venting changes. Call (833) 991-4970 to talk through your scope.
Ready to Get a Real Number?
Bring us your bathroom and we’ll crawl under it before we quote it. Free estimate, upfront pricing, written change orders before anything moves, and a 90-Day Done Right Promise on the finished work. Call (833) 991-4970 today and we’ll get your Irving bathroom on the schedule.
Written by the team at Barrett & Sons Construction Irving, serving Irving, TX.
What Our Customers Say
"Addition over the garage matched the original roofline and brickwork so closely that visitors do not realise it was added. He tracked down the closest brick he could find rather than settling."
- Gideon Stroud"The bathroom was finished on the day he said at the start, which nobody had led me to believe was possible."
- Loretta Vanterpool"He pulled every permit and had every inspection signed off. The last contractor we used told us permits were optional and I have been paying for that ever since."
- Redmond Cavanaugh












