







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
After# What It Costs to Hire a General Contractor in Irving, TX
Hiring a general contractor in Irving typically runs 10-20% of your total project cost as a markup or management fee, plus a separate line for allowances and permits. On a $90,000 remodel, that’s roughly $12,000-$18,000 in GC fees before a single allowance overage shows up. Call (833) 991-4970 and we’ll walk the numbers with you line by line, free, before you sign anything with anyone else.
Here’s the problem most Irving homeowners run into: the percentage looks clean on paper, then a $6,000 surprise invoice lands at the end because nobody put the allowance overage in writing before the work started. That gap is the number that actually decides whether your project finishes on budget.
## Why the GC percentage is only half the number in Irving
Irving sits on expansive black clay that swells in wet springs and shrinks through summer drought. That soil movement is why foundation and drainage surprises show up on jobs that started out simple – especially in the older ranch homes south of the airport, where original cast-iron sewer lines under pier-and-beam floors often fail mid-remodel. A kitchen or bathroom project there can turn into a foundation or plumbing job in week two.
A contractor with a real change-order process puts that in writing before the shovel moves. A contractor without one bills it at the end. The markup stays the same either way. The bill does not.
In Las Colinas and Valley Ranch, the surprise is usually different: HOA architectural reviews and design covenants that require brick or stone exteriors. That can swing material costs in ways a phone quote never mentions. We account for it up front or not at all.
## How to read a GC bid so Irving bids compare honestly
Two bids can land within $3,000 of each other and still be worlds apart. Here’s what to look for:
– Stated fee structure. A cost-plus contract shows the markup percentage, the allowance lines, and the permit fees separately. A lump-sum quote with vague allowances hides the same money under a rock.
– Allowances in writing. Ask what the allowance covers and what happens if you go over. If the overage clause is missing, that’s your surprise.
– Permits as a line item. Every eligible job gets permits pulled and inspections signed. A GC who skips permits to shave the bid is passing legal and insurance risk onto you. The permit inspector works for the homeowner, not for us – that’s why we like him.
– Change orders before work. Every scope change and every price change arrives as a signed written document before anyone touches the job.
– A name you can verify. Look up the license number before you sign anything with anyone.
The allowance that isn’t on paper is a surprise waiting for a date. We write it down. That’s the whole difference.
## Sample Irving budget: where a $14K GC fee turns into $20K
Take a $90,000 kitchen-plus-bath remodel in south Irving’s older ranch homes. A realistic split looks roughly like this:
| Line item | Low | High |
| - | - | - |
| Kitchen Remodel | $14,000 | $45,000 |
| Bathroom Remodel | $9,000 | $28,000 |
| Foundation or drainage repair (clay soil surprise) | $3,000 | $8,000 |
| Permit fees and inspections | $800 | $2,500 |
| GC markup (10-20%) on base project | $11,500 | $18,000 |
The markup on $90,000 runs about $12,000-$18,000 – the $14,000 the phone quote probably showed. Now add $6,000 in unreported foundation work. That’s how a $14K fee becomes $20K effective cost, and how customers get burned by national outfits that quoted one price on the phone and handed over a different bill at the door.
We do it the other way. Barrett & Sons Construction Irving is owner-operated, founded in 1998, and the crew members carry the Barrett name. Every scope, allowance, and price change is signed before work begins.
## What a real GC fee covers – and what it doesn’t
The markup on your project covers project management, scheduling subcontractors, site supervision, material coordination, and pulling permits. It doesn’t cover surprises. Surprises get change orders.
Here’s the quick list of what a legitimate GC should include in the fee:
– Pulling every eligible permit and signing every inspection
– A written scope with named allowances for brands like Kohler, Moen, or Delta fixtures
– Change orders signed before work proceeds, no exceptions
– A 90-Day Done Right Promise in writing on the contract
– Background-checked crew members on every visit
What it shouldn’t include: mystery allowances, mystery brands off a van, or “we’ll figure that out later” on permits. If you’re comparing bids, bring the written estimate to us – we’ll give you a free second opinion on it.
## Does the GC percentage change with project type in Irving?
Yes, because the labor and permit picture changes. A paver driveway installation runs $7,000-$18,000 with a modest GC load, while a home addition at $45,000-$130,000 or an ADU at $90,000-$220,000 carries more project management and inspections – so the effective markup percentage can land higher even when the rate is identical. Roof replacement at $8,000-$20,000 and window replacement at $4,500-$15,000 sit in the middle. Kitchen and bathroom remodels are where allowance gaps create the most pain, because premium fixture and cabinet choices vary so widely. For a fuller breakdown of scope and specs, see our kitchen and bathroom remodeling services.
## FAQs
### How much does it cost to hire a general contractor in Irving?
Expect to pay 10-20% of your total project cost as a GC fee, plus allowances and permits. On a $90,000 remodel that’s roughly $12,000-$18,000 in markup, and permit fees typically run $800-$2,500 depending on scope. Call (833) 991-4970 for an exact quote on your project – estimates are free.
### Is a 10% GC markup too low in Irving?
A 10% markup isn’t automatically too low, but treat it as a warning sign if the allowances are vague or rounded up silently. A cost-plus contract with written allowances justifies the rate. A low-ball quote with inflated allowances uses the 10% as bait. Compare the written allowances, not the percentage alone.
### Can you come today to review my estimate?
Yes. We answer the phone with a live person 24 hours a day, 7 days a week, and we offer a free second opinion on any written estimate you bring us – no trip charge inside the county. Call (833) 991-4970 and we’ll set a time.
### Is it cheaper to repair or replace when the clay soil surprises you?
Repair is almost always cheaper, but only if it’s put in writing through a change order before the crew proceeds. Foundation and drainage work on Irving’s clay soil can range $3,000-$8,000 for a typical surprise. A good GC writes that number down before the shovel moves, so you decide whether to repair or pause. Call us and we’ll price it either way.
## Stop comparing percentages – compare the paperwork
Any Irving general contractor can quote you a markup. Only one puts every scope, allowance, and change order in writing before the work begins, backs it with the 90-Day Done Right Promise, and answers the phone live when you call. Bring us your estimate for a free, no-hassle second opinion, and let’s compare line by line. Call (833) 991-4970 for a free estimate today.
Written by the team at Barrett & Sons Construction Irving, serving Irving, TX.
What Our Customers Say
"Addition over the garage matched the original roofline and brickwork so closely that visitors do not realise it was added. He tracked down the closest brick he could find rather than settling."
- Gideon Stroud"The bathroom was finished on the day he said at the start, which nobody had led me to believe was possible."
- Loretta Vanterpool"He pulled every permit and had every inspection signed off. The last contractor we used told us permits were optional and I have been paying for that ever since."
- Redmond Cavanaugh












