







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Kitchen Remodel Costs in Irving, TX – And Why Your Quote May Not Match the Guidebooks
Most Irving kitchen remodels land between $14,000 and $45,000, with the final number driven by cabinet line, countertop material, and whether the plumbing under your slab is sound. A smaller kitchen with stock cabinets and laminate can stay near $9,000 to $20,000. But in south Irving’s older ranch homes, we regularly see a $4,000 to $9,000 plumbing line item that national cost guides leave out entirely. Call (833) 991-4970 for a free estimate – a live person answers, day or night, and we’ll put the whole scope in writing before anyone touches a cabinet.

The South Irving Problem Nobody’s Cost Guide Mentions
We’ve remodeled enough south Irving kitchens to know the pattern. The moment a homeowner wants to move the sink six feet to anchor an island, the real question isn’t what tile they want. It’s when anyone last put a camera down that drain line.
The cast-iron drain lines under pre-1980 slab kitchens in this part of Irving are at or past their service life. Relocating a sink, moving a dishwasher, or shifting the island footprint means cutting concrete and looking at what’s underneath. Sometimes it’s fine. Often it isn’t. That inspection and repair runs $3,500 to $9,000 on top of the kitchen budget, and it has to be scoped before the design phase – not discovered mid-demo when the crew is already into the slab and the schedule is shot.
In the older ranch homes along the Bear Creek corridors, we’ve also run into original cast-iron under pier-and-beam floors that’s collapsing enough to replace during even a modest bathroom remodel, so it’s not a slab-only story. Point is: if a contractor hands you a kitchen bid without asking about your plumbing’s age, ask them why.
Why Irving’s Summer Heat Changes the Schedule
If a slab cut is needed, timing matters in a way it doesn’t in cooler climates. Irving’s July and August heat shortens the concrete cure window – a late-afternoon pour in 100-degree sun can compromise strength in ways that show up years later as cracks under your new tile. We plan slab work around cure conditions. A rushed national outfit with a tight production calendar won’t flag that, because their schedule is built around their numbers, not your slab.
And because that expansive black clay under much of Irving swells and shrinks with every wet and dry spell, we pay attention to drainage around the kitchen perimeter too. A kitchen that looks perfect and sits on moving soil won’t stay perfect. The Kitchen Remodeling page covers the full process room by room if you want the deeper walkthrough.
What Your Irving Kitchen Remodel Actually Costs
Here’s how the numbers break down for this market. Treat these as real ranges, not teaser prices – the kind of figures that hold up when we sit at your table with a written scope.
| Line Item | Typical Range |
|---|---|
| Full kitchen remodel | $14,000 – $45,000 |
| Small kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Slab-cut drain inspection & repair (south Irving pre-1980) | $3,500 – $9,000 |
Notice the island row. An island is the most requested upgrade in Irving kitchens right now, and it’s also the item most likely to drag plumbing along with it, because anchoring an island usually means moving the sink. We scope that before design, so the island line and the drain line show up in the same proposal instead of the second one showing up as a phone call you didn’t want.

Brand Transparency: Materials You Can Verify Yourself
We install KraftMaid cabinetry and Cambria quartz in our Irving kitchens. Both have public pricing ladders, which means you can look up the material cost yourself and check our number against it. When a competing bid lists “builder-grade cabinets” without a brand, that vagueness is doing a job – it lets the number move later. You can’t verify a mystery brand off a van.
The home page spells out how we handle the same transparency across every trade we work in: KraftMaid and Cambria in kitchens, GAF and CertainTeed on roofs, Andersen and Marvin on windows. Materials you can look up. Sinks and fixtures from brands like Sterling and Grohe are common requests in our remodels too, and we price them the same way – named, quoted, written down.
Every scope, every allowance, every price change arrives as a written change order before the work happens. No surprise invoice at the end. The allowance that isn’t on paper is a surprise waiting for a date.
When Your Irving Kitchen Remodel Touches HOA Territory
Las Colinas and Valley Ranch kitchens are a different job from south Irving kitchens, and not just because the houses are newer. If your remodel touches exterior elements – windows, kitchen venting, exterior door swaps – the HOA architectural review is part of the project, and some of these communities’ design covenants are strict (brick or stone exteriors, no visible metal sheds, limited exterior changes without approval).
We route HOA submittals as a standard project step, not an afterthought. That means the paperwork goes in early, alongside the permit package, so you’re not sitting on finished cabinets waiting for a committee meeting. Every eligible job gets permits pulled and inspections signed. The permit inspector works for you, not for me – that’s why we like him. If the last contractor you used told you permits were optional, that’s exactly the kind of thing we fix by doing it the documented way.
Common Scenarios We See in Irving Kitchens
- The south Irving ranch with a 1970s kitchen. Gut remodel with a sink move to anchor an island. Budget the drain inspection up front; it’s the line that decides whether the island happens this year or next.
- The Las Colinas kitchen with HOA strings. New windows and venting need architectural review. We pull the submittal into the schedule from day one.
- The Valley Ranch kitchen where cabinets are fine but everything else isn’t. Cabinet refacing plus new counters, backsplash, and flooring, proving you don’t always need a full gut job to change the room.
- The pre-1980 home under pier-and-beam. No slab cut, but the original cast-iron underneath often needs replacing before new fixtures go in.
How We Protect Your Investment After the Last Cabinet Goes In
Every completed Barrett & Sons Construction Irving kitchen is covered by the 90-Day Done Right Promise, written on the contract, not promised verbally. If a grout line cracks, a cabinet door binds, or a drain line weeps within 90 days, one call brings Tom back to make it right. That promise covers every cabinet, every countertop seam, every drain line – the whole room, not just the parts that were easy to stand behind.
Our technicians have up to 28 years of experience, our crews are background-checked, and Tom’s license number is published for you to look up before you sign anything. We’re owner-operated and local, not a franchise dispatching strangers to your door. If something’s wrong, we want to know about it – and we can be there.
Standing Offers on Every Irving Kitchen Remodel
- Free second opinion on any written estimate – hand us the bid you got from someone else and we’ll walk through it with you.
- $40 off any repair over $200 if you’ve got a small punch-list item to handle alongside the kitchen.
- No trip charge inside the county.
- Permanent 10% senior and veteran discount.
FAQs
Kitchen remodels in Irving typically run $14,000 to $45,000, with smaller kitchens landing between $9,000 and $20,000. The wild card for pre-1980 south Irving homes is the slab plumbing – a $3,500 to $9,000 line item if a drain line needs replacing when you move a fixture. Call (833) 991-4970 for an exact quote; estimates are free and a live person answers.
It depends on whether your cabinets and layout still work. If the boxes are solid but the countertops, backsplash, and flooring are dated, a partial remodel can save you thousands. If you’re moving the sink or the island, the plumbing scope usually pushes you toward a fuller remodel anyway. We’ll tell you honestly which side of that line your kitchen sits on – free second opinions on any written estimate you’re already holding.
Often, yes – scheduling depends on the scope and whether permits and HOA review are involved, since Las Colinas and Valley Ranch kitchens usually need both. We’ll give you a real start window in writing before you sign. Call (833) 991-4970 and a live person will answer, 24 hours a day.
Yes, on every eligible job, and inspections get signed off before we call the work done. Permit records protect you at resale and catch things a rushed crew would miss. If a contractor tells you permits are optional, that’s your answer about whether to hire them.
Get Your Irving Kitchen Remodel Priced in Writing
If you’ve been burned by a phone quote that didn’t match the final bill, we understand the hesitation. Every scope here gets written down, every price change gets a change order before work proceeds, and the 90-Day Done Right Promise is printed on your contract. Call (833) 991-4970 for a free estimate on your Irving kitchen remodel. A live person answers around the clock, and we’ll tell you straight what your kitchen needs – including whether the slab plumbing is a problem before you spend a dollar on tile.
Written by the team at Barrett & Sons Construction Irving, serving Irving, TX.
What Our Customers Say
"Addition over the garage matched the original roofline and brickwork so closely that visitors do not realise it was added. He tracked down the closest brick he could find rather than settling."
- Gideon Stroud"The bathroom was finished on the day he said at the start, which nobody had led me to believe was possible."
- Loretta Vanterpool"He pulled every permit and had every inspection signed off. The last contractor we used told us permits were optional and I have been paying for that ever since."
- Redmond Cavanaugh












